When shoring is required
In NSW, an excavation 1.5 m or deeper that someone will enter must be supported: shored, benched or battered, as specified by the engineer or the SWMS. Shoring wins on narrow trenches where there is no room to batter and no time to bench.
Steel shoring panels
For deep, long or heavy-traffic trenches placed by a bigger excavator. The sizes we hire most: lower panels 5000 x 2410 mm and upper panels 5000 x 2010 mm, stacked, with 2000 mm and 3000 mm handrails on top. A davit arm and recovery winch kit and a ladder access unit go with them.
Aluminium shoring boxes
Lighter boxes a 3 to 8 t excavator can place: lower 5 x 2.4 m and upper 5 x 1.7 m with 1493 struts, or 3.6 x 2.4 m boxes for short runs. A ladder access platform, an extension ladder (3.8 to 6.6 m) and a 4 m lifting chain complete the kit. Full sizes and weights are on the trench shoring hire page.
What to send for a quote
- Trench depth, width and length, and whether it moves along the street.
- The machine placing the boxes (size and lifting capacity).
- Start date and whether the hire rolls weekly.
- Whether road plates are needed over the top at night.
- Whether the trench takes on water: a sludge pump can go on the same quote.
Real job: five months in Bennett Park
A civil crew started with four steel panel sets, scaled down to two as the open length shortened, then switched to two aluminium boxes for the last stretch: three configurations on one account, more than 20 weekly invoices, each change a phone call.