● Servicing Australia-wide
Sydney · Newcastle · Wollongong · Canberra · Melbourne · Brisbane · Gold Coast · Adelaide · Perth
Home  ›  Guides  ›  Trench shoring
● Guide · Trench shoring

Trench shoring: when you need it and what size

Any excavation 1.5 m or deeper that a person enters has to be shored, benched or battered. On a narrow services trench, shoring is the fastest answer. This is what we hire, which system suits which trench, and what to send us so the quote is right first time.

1.5 m: the NSW line Steel or aluminium Access gear included
Steel trench shoring panels stacked on a crane truck HireHub
national network
From a five-month civil job
The guide

Which system, which trench

When shoring is required

In NSW, an excavation 1.5 m or deeper that someone will enter must be supported: shored, benched or battered, as specified by the engineer or the SWMS. Shoring wins on narrow trenches where there is no room to batter and no time to bench.

Steel shoring panels

For deep, long or heavy-traffic trenches placed by a bigger excavator. The sizes we hire most: lower panels 5000 x 2410 mm and upper panels 5000 x 2010 mm, stacked, with 2000 mm and 3000 mm handrails on top. A davit arm and recovery winch kit and a ladder access unit go with them.

Aluminium shoring boxes

Lighter boxes a 3 to 8 t excavator can place: lower 5 x 2.4 m and upper 5 x 1.7 m with 1493 struts, or 3.6 x 2.4 m boxes for short runs. A ladder access platform, an extension ladder (3.8 to 6.6 m) and a 4 m lifting chain complete the kit. Full sizes and weights are on the trench shoring hire page.

What to send for a quote

  • Trench depth, width and length, and whether it moves along the street.
  • The machine placing the boxes (size and lifting capacity).
  • Start date and whether the hire rolls weekly.
  • Whether road plates are needed over the top at night.
  • Whether the trench takes on water: a sludge pump can go on the same quote.

Real job: five months in Bennett Park

A civil crew started with four steel panel sets, scaled down to two as the open length shortened, then switched to two aluminium boxes for the last stretch: three configurations on one account, more than 20 weekly invoices, each change a phone call.

Rule1.5 m or deeper, anyone entering
Steel panels5000 x 2410 · 5000 x 2010 mm
Aluminium boxes5 x 2.4 · 5 x 1.7 · 3.6 x 2.4 m
Struts1493 on the aluminium boxes
AccessLadder unit or platform
LiftingDavit + winch or 4 m chain
Where to next

Related pages

Hire

Shoring hire Sydney

Boxes, panels, struts and access, delivered.

Read the job →
Case study

Five months of shoring in Bennett Park

The three configurations.

Read the job →
Hire

Road plate hire Sydney

Plates for over the top.

Read the job →
FAQ

Quick answers

Can I hire shoring by the week?

Yes. Shoring is a rolling weekly hire; you extend by phone and scale the gear up or down.

Do you deliver to the Central Coast?

Yes, loaded from Western Sydney yards; often with road plates on the same truck.

What is a 1493 strut?

The adjustable strut that holds the two sides of an aluminium box apart; the number is the strut model, which sets the trench width range.

Talk to a real person

Trench coming up?

Send the depth, width, length and the machine placing the boxes. We quote the system that fits, rolling weekly.

Quick contact

Send the basics and we'll come back with a price.

Call Quick Rates
Added item to Quick Rates