Inner West blocks are narrow and the spoil has to go out through the side passage. Two 600 kg tracked dumpers do in a day what a wheelbarrow does in a week, and the builder only needed them for the one day.
What we did
- Sourced two 600 kg dumpers from a partner yard with both on the ground that morning.
- Delivered them fuelled first thing, so the crew started on arrival.
- Collected the same afternoon when the builder called it done.
- One invoice: two dumpers, fuel, delivery and pick-up.
Short hires are not an afterthought for us. A broker that will do a one-day job well is the one that gets the four-week job next time.