Reliable submersible pumps hire across Sydney with fast turnaround and flexible hire terms.
Product photo| Type | Handles | Power | Best for |
|---|---|---|---|
| 50 mm submersible | Clean-ish water | 240 V | Flooded slabs, pits, cellars |
| 100 mm submersible | Higher flows | 240 V / 415 V | Big dewatering jobs |
| Trash / sludge pump | Solids & muck | 240 V / diesel | Muddy pits, sewage, slurry |
| Diesel surface pump | High volume | Diesel | Creeks, dams, long discharge runs |
Typical class figures — exact pump confirmed on your quote. Hoses, layflat discharge and float switches are quoted alongside. The classic mistake is a clean-water pump in a muddy hole — tell us honestly what's in the water.
For rainwater on a slab or in a pit, a 50 mm submersible does most jobs. Big volumes step up to 100 mm. The real question is what's in the water — the moment there's mud, leaves or solids, you want a trash pump, not a clean-water pump with ambitions.
A pump built to pass solids — mud, stones, debris — without blocking. Muddy excavations, stormwater pits and anything that smells bad are trash-pump territory. Clean-water pumps die quickly in that duty.
Quoted alongside — suction hose, layflat discharge and couplings matched to the pump. Measure the run from the water to wherever it's legally going and tell us the distance and any uphill.
With a float switch, yes — the pump cuts in when water rises and off when it's done, which is how basements and pits ride out a wet week. Ask for the float when you book.
50 mm pumps run from a standard outlet (mind the RCD); bigger electrics want 15 A or three-phase; diesel pumps need nothing but fuel. No power at the hole? Generator or diesel pump — we'll quote both.
Somewhere lawful — which usually means not straight into the stormwater system if it's dirty. Sites have their own discharge rules; silty water may need settling first. We supply the gear; your site's environmental controls govern the discharge point.
Tell us what you need and where — we’ll source it from our supplier network and send a sharp quote, usually same day.
No account, no friction — send the basics and we’ll source it.